For the Venedijk in Kampen, Schagen Infra, commissioned by the Municipality of Kampen, opted for innovative asphalt reinforcement with AsphaltX® fibres. 200 kg of fibres were processed into 400 tonnes of HMA asphalt, making the road surface more resistant to cracking and rutting.
The fibres form a three-dimensional reinforcement within the asphalt mixture and contribute to a longer service life, less maintenance and more efficient use of raw materials. The result is a strong, sustainable and future-proof road structure with lower maintenance costs and a smaller environmental impact.
Results
Partners & clients
- Gemeente Kampen
- Schagen Infra
Project photos
The products used.

AsphaltX®
2000 filaments per aramid strand — 19 million fibres per tonne of asphalt. Lowest CO₂ footprint, European manufacturing, proven on the N337.
- TypeAramid (Twaron®) + polyolefin fibre blend
- Length± 19 mm
- Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
- Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
Similar projects.
Asphalt · Druten · 2026Roundabout renovation – Druten
The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.
Asphalt · Doetinchem · 2026Varsseveldseweg Doetinchem
6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.
Asphalt · Witmarsum · 2018Road Reinforcement for Heavy Agricultural Traffic in Witmarsum
The road in Witmarsum, constructed in 2018, is subjected to heavy agricultural traffic. Thanks to the use of aramid fibers, cracking and rutting are minimized, contributing to a longer service life of the asphalt.