Varsseveldseweg Doetinchem

6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.

Asphalt · Doetinchem · 2026

The project in detail.

On the Varsseveldseweg in Doetinchem, 6 kilometres of asphalt were reinforced with AsphaltX® in the binder course. The work was carried out by Rusch Asfalt on behalf of BUHA.

The dosage was 500 grams per tonne of asphalt, with no change whatsoever to the mix design. The mixture used is, moreover, 100% circular in accordance with BRL 9023 — reinforcement and circularity go hand in hand here.

View the reference sheet (PDF)

Results

0 kmReinforced stretch
0%Circular · BRL 9023

Partners & clients

  • Rusch Asfalt
  • BUHA

Project photos

Used in this project

The products used.

AsphaltX® — Asphalt fibres
AramidAsphalt

AsphaltX®

2000 filaments per aramid strand — 45% more than competitors. Lowest CO₂ footprint, European manufacturing, proven on the N337.

  • TypeAramid (Twaron®) + polyolefin fibre blend
  • Length± 19 mm
  • Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
  • Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
More references

Similar projects.

Roundabout renovation – DrutenAsphalt · Druten · 2026

Roundabout renovation – Druten

The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.

0 tonnesAsphalt processed
0%Less cracking
View project
FIBRA Project RijkswaterstaatAsphalt · Roermond · 2020

FIBRA Project Rijkswaterstaat

BAM trialled fibre-reinforced porous asphalt (ZOAB) on the A73 to extend the service life of asphalt and reduce maintenance.

0%Lower CO₂ emissions
0 degreesAsphalt production temperature
View project
N711 Roundabout FlevolandAsphalt · Flevoland · 2023

N711 Roundabout Flevoland

Renovation of the N711 roundabout (Kamperhoekweg / Visvijverweg) with AsphaltX® Twaron aramid fibres. Resistant to heavy and torsional traffic loads, with an MKI score of €8.50 and around 70% lower environmental impact.

0 tonnesAsphalt processed
0 kgAsphaltX® fibres
View project