Tuindersweijde Construction Road
Temporary construction road for the Tuindersweijde new-build development, laid emission-free by Dura Vermeer on behalf of Anton Civiel & Infra and the Municipality of Koggenland.
The project in detail.
For the Tuindersweijde new-build project in Obdam, a temporary construction road was laid using AsphaltX®-reinforced asphalt. The work was carried out emission-free by Dura Vermeer, on behalf of Anton Civiel & Infra and the Municipality of Koggenland.
In total, 1,890 tonnes of asphalt were processed — with zero emissions during construction. The fibre reinforcement ensures the construction road can withstand heavy construction logistics throughout the entire project.
Results
Partners & clients
- Dura Vermeer
- Anton Civiel & Infra
- Gemeente Koggenland
Project photos
The products used.

AsphaltX®
2000 filaments per aramid strand — 19 million fibres per tonne of asphalt. Lowest CO₂ footprint, European manufacturing, proven on the N337.
- TypeAramid (Twaron®) + polyolefin fibre blend
- Length± 19 mm
- Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
- Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
Similar projects.
Asphalt · Druten · 2026Roundabout renovation – Druten
The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.
Asphalt · Doetinchem · 2026Varsseveldseweg Doetinchem
6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.
Asphalt · Witmarsum · 2018Road Reinforcement for Heavy Agricultural Traffic in Witmarsum
The road in Witmarsum, constructed in 2018, is subjected to heavy agricultural traffic. Thanks to the use of aramid fibers, cracking and rutting are minimized, contributing to a longer service life of the asphalt.