Tuindersweijde Construction Road

Temporary construction road for the Tuindersweijde new-build development, laid emission-free by Dura Vermeer on behalf of Anton Civiel & Infra and the Municipality of Koggenland.

Asphalt · Obdam

The project in detail.

For the Tuindersweijde new-build project in Obdam, a temporary construction road was laid using AsphaltX®-reinforced asphalt. The work was carried out emission-free by Dura Vermeer, on behalf of Anton Civiel & Infra and the Municipality of Koggenland.

In total, 1,890 tonnes of asphalt were processed — with zero emissions during construction. The fibre reinforcement ensures the construction road can withstand heavy construction logistics throughout the entire project.

View the reference sheet (PDF)

Results

0 tonnesAsphalt processed
0Emissions during construction

Partners & clients

  • Dura Vermeer
  • Anton Civiel & Infra
  • Gemeente Koggenland

Project photos

Used in this project

The products used.

AsphaltX® — Asphalt fibres
AramidAsphalt

AsphaltX®

2000 filaments per aramid strand — 19 million fibres per tonne of asphalt. Lowest CO₂ footprint, European manufacturing, proven on the N337.

  • TypeAramid (Twaron®) + polyolefin fibre blend
  • Length± 19 mm
  • Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
  • Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
More references

Similar projects.

Roundabout renovation – DrutenAsphalt · Druten · 2026

Roundabout renovation – Druten

The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.

0 tonnesAsphalt processed
0%Less cracking
View project
Varsseveldseweg DoetinchemAsphalt · Doetinchem · 2026

Varsseveldseweg Doetinchem

6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.

0 kmReinforced stretch
0%Circular · BRL 9023
View project
Road Reinforcement for Heavy Agricultural Traffic in WitmarsumAsphalt · Witmarsum · 2018

Road Reinforcement for Heavy Agricultural Traffic in Witmarsum

The road in Witmarsum, constructed in 2018, is subjected to heavy agricultural traffic. Thanks to the use of aramid fibers, cracking and rutting are minimized, contributing to a longer service life of the asphalt.

0 tonnesProcessed into asphalt
0 Yearin service
View project