Tuindersweijde Construction Road

Temporary construction road for the Tuindersweijde new-build development, laid emission-free by Dura Vermeer on behalf of Anton Civiel & Infra and the Municipality of Koggenland.

Asphalt · Obdam

The project in detail.

For the Tuindersweijde new-build project in Obdam, a temporary construction road was laid using AsphaltX®-reinforced asphalt. The work was carried out emission-free by Dura Vermeer, on behalf of Anton Civiel & Infra and the Municipality of Koggenland.

In total, 1,890 tonnes of asphalt were processed — with zero emissions during construction. The fibre reinforcement ensures the construction road can withstand heavy construction logistics throughout the entire project.

View the reference sheet (PDF)

Results

0 tonnesAsphalt processed
0Emissions during construction

Partners & clients

  • Dura Vermeer
  • Anton Civiel & Infra
  • Gemeente Koggenland

Project photos

Used in this project

The products used.

AsphaltX® — Asphalt fibres
AramidAsphalt

AsphaltX®

2000 filaments per aramid strand — 45% more than competitors. Lowest CO₂ footprint, European manufacturing, proven on the N337.

  • TypeAramid (Twaron®) + polyolefin fibre blend
  • Length± 19 mm
  • Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
  • Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
More references

Similar projects.

Roundabout renovation – DrutenAsphalt · Druten · 2026

Roundabout renovation – Druten

The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.

0 tonnesAsphalt processed
0%Less cracking
View project
Varsseveldseweg DoetinchemAsphalt · Doetinchem · 2026

Varsseveldseweg Doetinchem

6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.

0 kmReinforced stretch
0%Circular · BRL 9023
View project
FIBRA Project RijkswaterstaatAsphalt · Roermond · 2020

FIBRA Project Rijkswaterstaat

BAM trialled fibre-reinforced porous asphalt (ZOAB) on the A73 to extend the service life of asphalt and reduce maintenance.

0%Lower CO₂ emissions
0 degreesAsphalt production temperature
View project