Sustainable renovation of cycle paths

Concrete reinforcement with TwistR fibres for stronger and slimmer concrete structures.

Concrete · Sexbierum · 2019

The project in detail.

For this project, a concrete pavement was deliberately chosen — a solution that is increasingly being used for cycle paths thanks to its long service life, low maintenance requirements and excellent performance characteristics. Through the combination of a well-prepared, load-bearing subbase and TwistR GREEN HYBRID fibres, the concrete structure could be optimised efficiently.

View the reference sheet (PDF)

Results

0 kgTwistR fibres
~25%Lower project costs

Project photos

Used in this project

The products used.

TwistR® GREEN HYBRID — Concrete fibresMost chosen
SyntheticStructural

TwistR® GREEN HYBRID

High-performance synthetic macro fibres made from 100% polypropylene. Transforms concrete into a stronger composite material.

  • TypeHybrid: twisted monofilament + fibrillating network fibre
  • Material100% virgin polypropylene
  • Length48 mm
  • Dosage2.0 – 6.0 kg/m³
€ 7.43/ kgMore information

Pallet price on request

More references

Similar projects.

NDSM Werf AmsterdamConcrete · Amsterdam · 2023

NDSM Werf Amsterdam

TwistR® structural fibres as the foundation for the tree and flower planters at the iconic NDSM Werf. Complete replacement of traditional steel reinforcement.

0 kgSteel saved
0%CO₂ reduction
View project
N344 Cycle Path Barneveld — White ToppingConcrete · Barneveld · 2019

N344 Cycle Path Barneveld — White Topping

White topping renovation of the cycle paths along the N344 between Voorthuizen and Garderen: a 12 cm concrete pavement with TwistR® fibres over the reused asphalt structure. Around 25% lower project costs.

> 20 jaarExpected service life
~25%Lower project costs
View project
Greenhouse floor without steel reinforcementConcrete · Breezand

Greenhouse floor without steel reinforcement

Greenhouse floor realised in fibre reinforced concrete, which meant traditional steel reinforcement was not required. This delivered an efficient, sustainable and cost-saving solution.

0 meterPumped via pipeline
0%Saving vs. steel