Renovation of the N711 roundabout (Kamperhoekweg / Visvijverweg) with AsphaltX® Twaron aramid fibres. Resistant to heavy and torsional traffic loads, with an MKI score of €8.50 and around 70% lower environmental impact.
The project in detail.
For the renovation of the roundabout on the N711 Kamperhoekweg / Visvijverweg, Schagen Infra opted for AsphaltX®. The existing asphalt structure no longer met current requirements and was completely replaced with an asphalt mixture reinforced with AsphaltX® Twaron aramid fibres. This creates a structure that is better able to withstand heavy traffic loads, torsional forces and intensive use — ideally suited to roundabouts, junctions and heavily loaded roads.
Sustainability played an important role. In line with the circular ambitions of the Province of Flevoland and the contractor, a sustainable asphalt mixture was chosen with an MKI score (environmental cost indicator) of €8.50, reducing the environmental impact by around 70%. All machinery was run on 100% HVO diesel, cutting CO₂ emissions by around 90% compared to conventional diesel.
For this project, 1,585 tonnes of asphalt were processed and 400 kg of AsphaltX® fibres applied. The result: a future-proof roundabout with a longer service life, lower maintenance costs and a smaller environmental footprint.
Results
Partners & clients
- Provincie Flevoland
- Schagen Infra
Project photos
The products used.

AsphaltX®
2000 filaments per aramid strand — 19 million fibres per tonne of asphalt. Lowest CO₂ footprint, European manufacturing, proven on the N337.
- TypeAramid (Twaron®) + polyolefin fibre blend
- Length± 19 mm
- Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
- Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
Similar projects.
Asphalt · Druten · 2026Roundabout renovation – Druten
The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.
Asphalt · Doetinchem · 2026Varsseveldseweg Doetinchem
6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.
Asphalt · Witmarsum · 2018Road Reinforcement for Heavy Agricultural Traffic in Witmarsum
The road in Witmarsum, constructed in 2018, is subjected to heavy agricultural traffic. Thanks to the use of aramid fibers, cracking and rutting are minimized, contributing to a longer service life of the asphalt.