Provincial road N337

AsphaltX® fibres applied for structural asphalt reinforcement over 8 km of road surface. Significant reduction in rutting and cracking.

Asphalt · Overijssel · 2018

The project in detail.

On the N337 provincial road between Zwolle and Deventer, AsphaltX® was applied throughout the asphalt construction over an 8-kilometre stretch. The aramid fibres reinforce the asphalt through and through, without requiring any adjustment to the asphalt plant's mix design.

The results after monitoring: 50% less rutting and 30% less cracking compared to the reference section. This increases the expected service life of the road surface by around 30% — less maintenance, less traffic disruption and a demonstrably lower MKI score for the road authority.

Results

0%Less rutting
0%Less cracking
0 kmReinforced road surface

Partners & clients

  • Provincie Overijssel

Project photos

Used in this project

The products used.

AsphaltX® — Asphalt fibres
AramidAsphalt

AsphaltX®

2000 filaments per aramid strand — 19 million fibres per tonne of asphalt. Lowest CO₂ footprint, European manufacturing, proven on the N337.

  • TypeAramid (Twaron®) + polyolefin fibre blend
  • Length± 19 mm
  • Tensile strengthTwaron 3000 MPa · polyolefin 483 MPa
  • Specific gravityTwaron 1.45 · polyolefin 0.91 g/cm³
More references

Similar projects.

Roundabout renovation – DrutenAsphalt · Druten · 2026

Roundabout renovation – Druten

The Municipality of Druten and contractor Remmits opted for AsphaltX® Twaron aramid fibres: stronger asphalt, less maintenance and a longer service life.

0 tonnesAsphalt processed
0%Less cracking
View project
Varsseveldseweg DoetinchemAsphalt · Doetinchem · 2026

Varsseveldseweg Doetinchem

6 km of asphalt reinforced with AsphaltX® in the binder course by Rusch Asfalt, commissioned by BUHA. Dosage of 500 g/tonne, with no change to the mix design.

0 kmReinforced stretch
0%Circular · BRL 9023
View project
Road Reinforcement for Heavy Agricultural Traffic in WitmarsumAsphalt · Witmarsum · 2018

Road Reinforcement for Heavy Agricultural Traffic in Witmarsum

The road in Witmarsum, constructed in 2018, is subjected to heavy agricultural traffic. Thanks to the use of aramid fibers, cracking and rutting are minimized, contributing to a longer service life of the asphalt.

0 tonnesProcessed into asphalt
0 Yearin service
View project